EUVE Online Technical Archive
How to find things in this Archive
Welcome to the EUVE Project Technical Archive. This archive contains
collected science and engineering information on the EUVE
instruments, electronics, and operations.
WARNING This archive was
transfered from CEA near the end of the EUVE mission and only
contains memos that were available electronically at that time.
If links are missing, chances
are the document was lost, but please contact
archive@stsci.edu if you have any questions or comments.
Documents available include technical memos, drawings,
test results, instrument performance reports, and records of problem
resolutions over the history of the project.
To do a keyword search, use the "find in current" button in the File
menu.
If nothing has grabbed you yet, choose a broad area of the Project for your
search from the list below:
Use the "Back" button or the scroll bar if you need to back up.
If you have a question about an instrument or payload subsystem, go to the
list of subsystem topics .
Document formats available
Most of the current documents are in TeX-dvi, PostScript or plain
ASCII formats. Parts of a single document may be packaged in different formats.:
LaTeX dvi files
Displayed automatically with xdvi. These may have text, and tables, but no
figures.
Encapsulated PostScript files
Displayed automatically with Ghostview. These may contain whole memos or
figures for related documents.
ASCII files
Unformatted text-only versions of documents appear in the Mosaic window.
Requesting further information
If you would like to request that new information be made available through
the Archive, please send e-mail to:
archive@stsci.edu
*********************************************************************
To skip directly to a particular instrument's entries, click on one of the following:
Dithering Spectra to Improve Signal
to Noise June 24, 1994 (PAT/EUVE/0074/94)
New Improved Wavelength Scales Jan. 25, 1994. (WTB/EUVE/0012/94) and GRAPHICS 1 , 2 , 3 , 4
Spectrometer UV Light Leak Sept 10, 1993. (PAT/EUVE/0154/93)
Background Check on Spectrometer Detectors After Threshold Change Sept. 2, 1993. (AM/EUVE/0147/93) and GRAPHICS 1 , 2 , 3 , 4 , 5 , 6 ,
Determining Wavelength Scales for the EUVE Spectrometers June 7, 1993 and FIGURES 1 and 2
Initial Studies of Background Levels in the Spectrometer Dec 21, 1992. (AM/EUVE/0493/92) and GRAPHIC ,
New Threshold to Improve Signal to Noise Feb 14, 1992. (ME/EUVE/0045/92)
Postrework Spectrometer Resolution Measurements Sept 11, 1991. (WTB/EUVE/0594/91)
LW Spectrometer Wavelength Scale: Ray-Tracing vs. Calibration Data, April 29, 1991. (WTB/EUVE/0249/91)
Spectrometer Wavelength Maps Derived from Ray Traces March 13, 1991. (PAT/EUVE/0194/91)
Spectrometer Wavelength Scales Feb 6, 1991 (WTB/EUVE/0090/91)
Spectrometer Resolution Jan 24, 1991 (WTB/EUVE/0053/91)
Count Rates and the Spectrometer Wavelength Scale Jan 23, 1991 (WTB/EUVE/0050/91)
Spectrometer Spectral Light Leak Analysis and Solution Oct 25, 1990. (PAT/EUVE/0731/90)
Spectrometer Diffuse Light Leak Analysis and Solution Sept 25, 1990. (PAT/EUVE/0485/90)
Survey of Leak Data in MN LW Spectrometer Channels January, 1990. (AM/EUVE/0354/90) and TABLE
Streak in DS Images from Spectrometer Calibration January , 1990 AM
Summary of November 1994 WSZ/PH Analysis
January 16, 1995. (ME/EUVE/0005/95) (ASCII only)
Summary of Detector and Filter Serial Numbers Sept 24, 1993. (JVV/EUVE/160/93)
Carbon and Boron Edge Due to SW Lexan Filter. Sept 16, 1993
Lexan/B UV Leak Revisited March 17, 1992 (JVV/EUVE/0483/92)
Tin Pinholes May 16, 1991 (JVV/EUVE/0329/91)
Backup Scanner C Filter Calibration April 8, 1991. (PWV/EUVE/0243/91)
Tin Low Temperature Tests and Plot Feb 6, 1991. (PWV/EUVE/0089/91)
Pinholes in the Tin Quadrants of S/N Sc3-21 Jan 22, 1991 (JVV/EUVE/0051/91)
Tin Filter Phase Change Aug 24, 1990. (PWV/EUVE/0601/90)
Revised Filter Frame Locations July 12, 1990. (WTB/EUVE/0530/90)
Error in Halo Memo (JVV/EUVE/0179/90) March 20, 1990 (JVV/EUVE/0223/90)
Image Halos Caused by Photoemission from Filters March 6, 1990 (JVV/EUVE/0179/90)
Measurements of the Ultraviolet Leak Feb 16, 1990 (JVV/EUVE/0137/90)
Ultraviolet Leak Dec 14, 1989 (JVV/EUVE/1293/89)
Organization of Filtercode Software April 12, 1988. PWV
Deep Survey Gain Sag October 14,
1994 (ME/EUVE/0136/94)
Detector Thresholds September 23,
1994 (ME/EUVE/0119/94)
High Pulse Height Deviations for Stimpin
on Scanner A August 15, 1994 (ME/EUVE/0101/94)
Stim Pin Drift (MDL/EUVE/0189/93)
Useful radii and Geometric Centers of Euve Detectors Feb 10, 1993. (WTB/EUVE/0021/93)
Updated QE Values for SP01 Nov 19, 1992. (BAS/EUVE/0471/92) and GRAPHIC
Central Hotspot in SP Detectors Nov. 18, 1992. (MJA/EUVE/0469/92)
In-Orbit Locations of Hotspots on Spectrometers Nov. 18, 1992. (MJA/EUVE/0468/92)
Changing TifX+5 Reference Limits Nov 12, 1991. (JVV/EUVE/0737/91)
Detector Deadspot Update May 17, 1991. (BAS/EUVE/0263/91)
Relative Intensities of Euve Scanner C Images and Electron Halos March 1991 (MMS/EUVE/0207/91)
Detector Hotspot Update Feb 27, 1991 (BAS/EUVE/0120/91)
Spatial Resolution and Linearity for SC005 and SP001 Feb 27, 1991. (BAS/EUVE/0119/91)
2nd London Conference on Position Sensitive Detectors Sept 12, 1990 (JVV/EUVE/0634/90)
EUVE Scanner Stimpulser Anomalies II August, 1990. (MMS/EUVE/0602/90)
Rescaling of EUVE Detector Flat Field Images , Corrected, July 3, 1990. (BAS/EUVE/0486/90) the
Table
Initial Analysis of Detector #1 (ScA) High Background Event June 17, 1990 (JVV/EUVE/0317/90)
Calibration Report on Pulse Height vs. Position June 11, 1990 (JVV/EUVE/0316/90)
Check for Hotspots & Stimpin Anomolies in GSFC Data March 15, 1990 (BAS/EUVE/0701/90)
EUVE Stimpulser Locations and Pulse Height Distributions March, 1990. (MMS/EUVE/0204/90)
Flight Detector Hotspots Feb 26, 1990 (JVV/EUVE/0156/90)
Rescaling of EUVE Detector Flat Field Images Feb 21, 1990. (BAS/EUVE/0142/90) its
Table and its
Graphic
Relative Intensities of EUVE Scanner Images and Electron Halos January, 1990. (MMS/EUVE/0178/90)
Spatial Linearity and Linearity Tests Oct 31, 1989 (JVV/EUVE/1157/89)
Flight Detector Deadspots Oct 31, 1989 (JVV/EUVE/1156/89)
Flight Detector Hotspots Sept 13, 1989 (JVV/EUVE/0961/89)
Detector Test and Calibration (JVV/EUVE/2202/88)
Ways in which photons are lost from telemetry. October 14, 1994 (ME/EUVE/0034/94)
Threshold Test Results July 2, 1993. (JVV/EUVE/0098/93)
New Thresholds to Improve Gain and Signal to Noise May 14, 1993 (SEB/EUVE/0075/93)
Obscure Primbsching Effect Feb 11, 1993 (JVV/EUVE/0161/93)
ADC/TIF Deadtime Calibration October 21, 1992. (JVV/EUVE/0449/92)
IOC Functional Tests, A Summary March 15, 1992. (ME/EUVE/0148/92)
New Threshold to Improve Signal/Noise January 20, 1992. (ME/EUVE/0045/92)
EUVE Dead Time and Primbsching cont., January, 1992. (MMS/EUVE/0012/92)
Ion Pump Problem June 6, 1991. PAT
EUVE Dead Time and Primbsching January, 1992. (MMS/EUVE/0012/92)
Scanner C and DS/S Recalibration Data Analysis Plan Feb 19, 1991 (BAS/EUVE/0121/91)
Kiwi Noise Tests Effects on Imaging, Stimpulsers, and Pulse Heights, January 1991. (MMS/EUVE/0052/91)
Setting of Hardware and Software Thresholds Oct 19, 1990 (JVV/EUVE/0782/90)
Primbsching and Related Tests and Calibrations Jan 6, 1990 (JVV/EUVE/0004/90)
Threshold Test Results July 2, 1993. (JVV/EUVE/0098/93)
Ion Pump Turn On/Off Criteria During Orbit 2 May 27, 1992. (JVV/EUVE/0306/92)
Policy Recommendations on the ISW Patch Installation April 6, 1992. (JVV/EUVE/0209/92)
Changing TifX+5 Reference Limits Nov 12, 1991. (JVV/EUVE/0737/91)
Updated Red and Yellow Limits for Detector Safety Nov 7, 1991. (JVV/EUVE/0734/91)
TiF 5 Volt Reference Voltage Drift Effect on HV June 11, 1991 (JVV/EUVE/0378/91)
Red and Yellow Limits for Detector Safety June 5, 1991. (JVV/EUVE/0376/91)
Bakeout Heater Command Disabling May 16, 1991 (JVV/EUVE/0331/91)
EUVE Engineering Monitor Red Limits April 24, 1991. (PWV/EUVE/0289/91)
Mirror Thermal Control Algorithm Jan 26, 1990. (PAT/EUVE/0072/90)
To skip directly to the particular engineering test results, click on one of the following:
Thermal Results
Jupiter miniIOC Thermal Results May 27, 1994.
MiniIOC Summary and Correlation with GSFC Thermal Model September 7, 1993.
MiniIOC Thermal Model Predictions with Measured Temperatures August 31, 1993
MiniIOC Thermal Map August 11, 1993.
MiniIOC Spacecraft Attitudes and Times August 10, 1993.
Monthly Payload Temperatures March and April, 1993.
Memo on MiniIOC Expectations April 28, 1993 (JLT/EUVE/0071/93)
Memo on MiniIOC Expectations March 19, 1993 (JLT/EUVE/0044/93)
Temperature Limits for 19 Thermistors August 29, 1991
Thermal Vacuum Test Results October 21, 1991.
Extreme THERMISTOR values experienced during electronics testing at UCB/SSL May 8, 1991.
Extreme THERMISTOR values experienced during Component Instrument testing at BASG May 8, 1991.
Extreme THERMISTOR values experienced during PM Phase II Thermal Vacuum testing at GSFC May 8, 1991
Power and Electrical Systems
RifXCur statistics during Survey Phase (3 RPO)
Actual Electronic Box Power from the EUVE Science Payload October 15, 1990.
Voltage and Current Limits for Electrical Parameters August 29, 1991
Launch and IOC Results
Summary of Orbit Perfomance IOC Data After 4 days July 13, 1992.
Summary of Orbit Perfomance IOC Data (Jun 11 & 15 ) July 13, 1992.
Summary of Orbit Perfomance IOC Data for Periodic Review July 10, 1992.
Summary of Instrument Activities during Initial IOC Period July 2, 1992.
hide scripts from old browsers